Menu Close

BAC RESOLUTION CONTRACT-CONSTRUCTION OF 1 STOREY LIBRARY HUB BUILDING (22.50M X 9.50M) – GROUND IMPROVEMENT, PERIMETER FENCE, PERIMETER SOLAR LIGHTING, CANAL LINING, GATE, FURNITURE, WATER SYSTEM, GROUND IMPROVEMENT, HYBRID SOLAR SET-UP AS POWER SOURCE, INSTALLATION OF ELECTRICAL LINE FROM COOPERATIVE LINE AND SLOPE PROTECTION AT BALAWAG CS